2g) CLOSING: Check Next Days Programming


1. Review Tomorrow's Programming

  • Check the next day's programming at the end of the day.

  • Example: For Thursday, the programming includes rope climbs and eco bikes.


2. Prepare Equipment for Rope Climbs

  • Get the ladder out of the shipping container.

  • Pull out the ropes and lay them out under the rope climb station.


3. Hang Ropes for Coaches

  • If there is a tall person available, hang the ropes for the coaches.

  • This is a common courtesy to help out during busy times.


4. Check Next Day's Programming for Other Classes

  • Review programming for other classes, e.g., Thrive and Build.

  • Note if any additional equipment is needed, such as slant boards for Bulgarian split squats.


5. Clean Up the Space

  • Before closing procedures, clean the floor and reorganize equipment.

  • Move EcoBikes to their designated spots for the next day's classes.


6. Set Up for Success

  • Ensure the space is ready and equipment is set up for the next day.

  • Double-check the programming to help set coaches and classes up for success.


7. Emphasize Teamwork and Core Values

  • Remember the importance of the 'win-together' core value.

  • Focus on setting each other up for success as a team.

Link to Loom

https://www.loom.com/share/b2cbbbc016d5468ab019d44dceda93dd

Previous

2h.1) Full Closing Walkthrough

Next

2h.2) Door Checks